Contact Us

800.245.5676

United States

    • Model D
    • Assembly and How To Videos
    • Maintenance
    • Troubleshooting and Repair
    • Manuals and Schematics

Model D How To Videos

The Model D Indoor Rower requires the installation of the front legs using a total of eight screws. We include the necessary tool and clear, illustrated instructions. Allow about 20–30 minutes for the job.

Once all the installation steps are completed you will need to connect the monorail end of the indoor rower with the flywheel end. This procedure is illustrated in the assembly instructions, or you can view the procedure in the video clips below.

Please note that this procedure differs slightly depending on when your Model D Indoor Rower was manufactured. Refer to the following dates to access the appropriate video for your indoor rower.

Model D and RowErg with standard legs August 2006–Present

Assembly Instructions (PDF)

Framelock Connection

 

Model D July 2003-August 2006

Assembly Instructions (PDF)

Framelock Connection
The referenced media source is missing and needs to be re-embedded.
Framelock Disconnection
The referenced media source is missing and needs to be re-embedded.

Greg Hammond, a member of our Marketing team, demonstrates how to replace a generator coil on a Model D Indoor Rower. These instructions can be used for a RowErg, Model E or Model C rower as well.

Model D Generator Coil Replacement (PDF)
 

Materials Needed

  1. phillips screwdriver
  2. 7/16” (11 mm) or adjustable wrench
  3. 5/32” (4 mm) allen wrench

Instructions

Gently remove the generator:

  1. Remove the generator cover from the generator base by removing two screws. The generator cover is located just past where the chain goes into the erg.
  2. Note the wire routing before you begin the next steps.
  3. Using the allen wrench and 7/16” wrench, loosen the two chain guide fasteners.
    • Grasp the generator from each end and pull up and out.
    • Continue to remove it by following the wire and pulling it out of the plastic clips as you go. You'll hear little snaps as you pop it out of the clips.
    • Unplug the wire from the Performance Monitor (PM).
    • Remove wire and generator coil unit.

Generator Coil Replacement
Next, you'll install the new generator.

  • Insert it into the generator base with the green circuit board facing up and the wire trailing out towards the monitor arm.
  • Replace the cover and install the two screws that hold it on.
  • Route the wire the same way you removed it, back up to the monitor. Avoid bending, pinching or kinking the wire by allowing adequate slack (approximately 2 inches).
  • As you reach the hinge point of the monitor arm, leave a little extra wire sticking out in a loop to allow easy movement of the monitor arm.
  • Finish threading the wire up along the monitor arm, and then through it so that it comes out just below the PM.
  • Finally, plug the wire into the PM, making sure you feel it click into place.
  • Tighten chain guide fasteners.

Greg Hammond, a member of our Marketing team, demonstrates how to rebox a Model C or Model D Indoor Rower.

Model D Reboxing Instructions (PDF) (serial# 072206 to present)
Model D Reboxing Instructions (PDF) (serial# 071403 to 072106)
 

This video to learn how to adjust the shock cord on your RowErg. These instructions can also be used for the Model C, Model D, or Model E rowers.

Shock Cord Adjustment (PDF)
 

This video guides you through swapping the Chain, Axle, Sprocket and Shock Cord on your Model C, D, E or RowErg.

Chain Replacement (PDF)
Axle, Sprocket Replacement (PDF)
Shock Cord Replacement (PDF)